Still in the night, the wagons rolled on to the Danube port of Deggendorf to be used directly there. After 2 hours of careful loading, our SNPS7s were ready for the journey to the sawmill.
By the way, Said Cosic (Fleet Manager SETG, left) and Andreas Seipel (ERR Sales, right) were on site.
A little quiz on the side:
How many logs do you think are on the wagon?
#Timber transport #ERR #SETG